Project Details
Phase Capacity
GF 1 (thermal) 2 x 300 MW
GF 2 (thermal) 2 x 300 MW
GF 3 (thermal) 2 x 500 MW
GF 4 Gas Turbines 2 x 110 MW
TOTAL CAPACITY 2420 MW
| Generating Facility 1 | Generating Facility 2 | Generating Facility 3 |
|---|---|---|
|
Construction began in 1981 Nominal capacity: 2 units x 300 MW Conventional Thermal Front firing Fuel – Gas / Oil Manufacturers: Boiler – Riley Mitsui Turbine – MHI Commissioned in 1985 & 1986 Initial commissioning in oil Unit 2 gas firing commissioned in 1991, Unit 1 in 1994 |
Construction began in 1985 Nominal capacity: 2 units x 300 MW Conventional Thermal Opposite firing Fuel – Coal / Gas / Oil Manufacturers: Boiler – IHI Turbine – MHI Commissioned in 1988 (Unit 3), 1989 (Unit 4) Gas commissioning for Units 3 & 4 in 1999 |
Construction began in 1995 Nominal capacity: 2 units x 500 MW Conventional Thermal Opposite firing Fuel – Coal / Gas / Oil (25% rated load) Manufacturers: Boiler – IHI Turbine – GE Taking over in year 2000 |