Generating Facility

Project Details

Phase                               Capacity

GF 1 (thermal)               2 x 300 MW

GF 2 (thermal)               2 x 300 MW

GF 3 (thermal)               2 x 500 MW

GF 4 Gas Turbines        2 x 110 MW

TOTAL CAPACITY           2420 MW

Generating Facility 1 Generating Facility 2 Generating Facility 3
Construction began in 1981
Nominal capacity: 2 units x 300 MW
Conventional Thermal
Front firing
Fuel – Gas / Oil
Manufacturers: Boiler – Riley Mitsui Turbine – MHI
Commissioned in 1985 & 1986
Initial commissioning in oil
Unit 2 gas firing commissioned in 1991, Unit 1 in 1994
Construction began in 1985
Nominal capacity: 2 units x 300 MW
Conventional Thermal
Opposite firing
Fuel – Coal / Gas / Oil
Manufacturers: Boiler – IHI Turbine – MHI
Commissioned in 1988 (Unit 3), 1989 (Unit 4)
‏ Gas commissioning for Units 3 & 4 in 1999
Construction began in 1995
Nominal capacity: 2 units x 500 MW
Conventional Thermal
Opposite firing
Fuel – Coal / Gas / Oil (25% rated load)
‏ Manufacturers: Boiler – IHI Turbine – GE
Taking over in year 2000